金属磁记忆法在全球的应用案例

List of executed works in the world


NNDateEnterpriseName of workType of equipmentTotal working hours
ANGOLA
1.2006Kapanda HPSStressed-strained state test of girth weld of pressure conduit at hydroturbine units No.3.4

ARGENTINA
1.2005REPSOL YPF CompanyInspection of ball tanks at Planta de Gas Licuado La Plata plant

2.2005TGS CompanyInspection of gas turbine disks and blades at gas-transfer station

3.2005PROFERTIL Company, Bahia BlancaInspection of steam turbine blades and process pipelines

4.2005Central Termoelectrica Luis Piedra Buena S.A., Bahia BlancaInspection of steam turbine studs and individual parts at electric power station

5.2005PBB Polisur Company, Bahia BlancaInspection of steam turbine blades and high-pressure pipelines at polyethylene-producing plant

6.2005OLDELVAL S.A. CompanyInspection of gas turbine disks and blades at gas-transfer station

7.2009-2014IGP SRLNon-contact magnetometric diagnostics of pipelines at enterprises of oil and gas industry in Argentina, Brazil, Chile and Ecuador with the support of Energodiagnostika1715 km20-40 years
AUSTRALIA
1.1993Queensland Electricity Commission (QEC), diagnostic laboratoryDiagnostics of turbine blades and mill ballsK-125 turbine
2.1993State Electricity Commission of Victoria (SEC), diagnostic laboratoryDiagnostics of welded joints of pipes and turbine rods

3.1993BP OIL. BP Refinery Pty.Diagnostics of oil pipelines and armature

4.1993BHP Engineering (Wollongong)Control of compressor shafts and mill components

5.1994Public Transport CorporationDiagnostics of band rings of wheels and rails

AZERBAIJAN
1.2013BP AGTInspection of the buried pipeline20 km18 years
BELARUS
1.1991Lukomlsk TPSDiagnostics of turbine rotorsK-300 turbine
BULGARIA
1.1992TPS "Kazanlyk"Diagnostics of waterwall tubes and station steam and water tubes

2.1992-1993Sliven TPSDiagnostics of waterwall tubes and steam super-heater on boilers #1,2160 t/hour boiler150000- 170000
3.1993Varna TPSDiagnostics of rotors of K-210-130 turbine unit 2210 MW turbine140000
4.1994TPS-2 "Maritsa-Vostok"Diagnostics of rotors of K-160 turbine unit 3160 MW turbine160000
5.2006NPP "Kozlody"Inspection of babbit abutment on bearings. Inspection of stress distribution in tightened bolted joints. Diagnostics of pipeline

6.2014NPP "Kozlody"Inspection of turbine rotor, blades and pump. Non-contact magnetometric diagnostics of circulation water pipelinesK-1000 turbine; 6 km
7.2017-2018Lukoil Neftohim Burgas ADNon-contact magnetometric diagnostics of buried pipelines170 km30 years
CHINA
1.1995Czilin TPSDiagnostics of steam and water pipelines

2.1999Metallurgical plant "Anshan"Diagnostics of bends.

3.1999Tindjow TPSDiagnostics of welds of steam lines and vessels

4.2000Beijin TPS-2Diagnostics of blades and economizer tubesс50-90/1.2-I turbine, 50 MW100000
5.2000"Magnetic Flux" companyDiagnostics of wheels of railway transport

6.2000North-East of China Electric Power Research instituteExecution of experimental works on the equipment and delivery of inspection devices

7.2000North China Electro-Power Research instituteExecution of experimental works on the equipment and delivery of inspection devices

8.2000Heilongjiang Electric Power Research InstituteExecution of experimental works on the equipment and delivery of inspection devices

9.2000Tianjin Electric Power Research InstituteExecution of experimental works on the equipment and delivery of inspection devices

10.2000Jiansu Province Electric Power Research InstituteExecution of experimental works on the equipment and delivery of  inspection devices

11.2000BAOSTEEL Metallurgical works, ShanghaiExecution of experimental works on the equipment and delivery of inspection devices

12.2001Electric Power Research Institute of Inner MongoliaExecution of experimental works on the equipment and delivery of inspection devices

13.2001The Institute of Boiler & Pressure Vessel Inspection (BPVI), Daqin Petroleum Administrative BureauExecution of experimental works on the equipment and delivery of inspection devices

14.2001National Center for Quality Inspection & Testing of Hydro Steel Structure Ministry of Water ResourcesExecution of experimental works on the equipment and delivery of inspection devices

15.2001Beijing Center for boilers and pressure vessels inspectionExecution of experimental works on the equipment and delivery of inspection devices

16.2001Chemical Plant, Yunnan provinceExecution of experimental works on the equipment and delivery of inspection devices

17.2001Shandong Electric Power InstituteExecution of experimental works on the equipment and delivery of inspection devices

18.2001Chemical-petroleum plant. Guandong, Maoming provinceExecution of experimental works on the equipment and delivery of inspection devices

19.2002Sha Lin Zi TPS, Zhang Jia Kou, Hebei provinceExecution of experimental works on the equipment and delivery of inspection devices

20.2002Xia Hua Yuan TPS, Zhang Jia Kou, Hebei provinceExecution of experimental works on the equipment and delivery of inspection devices

21.2002Gao Jing TPS, BeijingExecution of experimental works on the equipment and delivery of inspection devices

22.2002Dou He TPS, Tang Shan, Hebei provinceExecution of experimental works on the equipment and delivery of inspection devices

23.2002North China Electro-Power Research institute (NCEPRI)Execution of experimental works on the equipment and delivery of inspection devices

24.2002Institute of Oil, Daqin, province HeilongjiangExecution of experimental works on the equipment and delivery of inspection devices

25.2002Beijing Polytechnic InstituteExecution of experimental works on the equipment and delivery of inspection devices

26.2002Railway Research Institute, Xian, Shaanxi provinceExecution of experimental works on the equipment and delivery of inspection devices

27.2002Pipeline Research Institute of CNPC, Langfang, Hebei provinceExecution of experimental works on the equipment and delivery of inspection devices

28.2002Electric Power Research Institute of Hebei provinceExecution of experimental works on the equipment and delivery of inspection devices

29.2002Hai Kou TPS, Hainan provinceExecution of experimental works on the equipment and delivery of inspection devices

30.2002Hunan Electric Power Test and Research InstituteExecution of experimental works on the equipment and delivery of inspection devices

31.2002Harbin Research institute of Electric MachinesExecution of experimental works on the equipment and delivery of inspection devices

32.2002Zhejiang Electric Power Test and Research InstituteExecution of experimental works on the equipment and delivery of inspection devices

33.2002Chinese-North Korean JSCExecution of experimental works on the equipment and delivery of inspection devices

34.2003The Institute of Boiler & Pressure Vessel Inspection (BPVI) of Wuhan Metallurgical WorksExecution of experimental works on the equipment and delivery of inspection devices

35.2003ShendiwanlongExecution of experimental works on the equipment and elivery of inspection devices

36.2003Shanghai institute on inspection of special equipmentExecution of experimental works on the equipment and delivery of inspection devices

37.2003"DAZHOU" TPSExecution of experimental works on the equipment and delivery of inspection devices

38.2003Jiangsu Province Boiler & Pressure Vessel inspection Center (JSBPVI), NanjingExecution of experimental works on the equipment and delivery of inspection devices

39.2003Jiangxi Province Boiler & Pressure Vessel inspection Center, NanchangExecution of experimental works on the equipment and delivery of inspection devices

40.2003Sanxi Province Electric Power Research InstituteExecution of experimental works on the equipment and delivery of inspection devices

41.2004Company for Directional Drilling "DDDC", DaganExecution of experimental works on the equipment and delivery of inspection devices

42.2004Company of NDT Instruments "Yui Jia", XianExecution of experimental works on the equipment and delivery of inspection devices

43.2004Center for Pipelines Inspection at Chinese National Petrolium CorporationExecution of experimental works on the equipment and delivery of inspection devices

44.2005Center for Special Equipment Inspection, province HunanExecution of experimental works on the equipment and delivery of inspection devices

45.2005"Kehaihengsheng Beijing" CompanyExecution of experimental works on the equipment and delivery of inspection devices

46.2005Heat and Power Engineering Company, ShenyangExecution of experimental works on the equipment and delivery of inspection devices

47.2005Development center of Ventilator Company Group, province ShanxiExecution of experimental works on the equipment and delivery of inspection devices

48.2005Yantai TPS, province ShandongExecution of experimental works on the equipment and delivery of inspection devices

49.2005Xian Scientific-Technical Building UniversityExecution of experimental works on the equipment and delivery of inspection devices

50.2005Electric Power Company "Lingunliyang", province ShandongExecution of experimental works on the equipment and delivery of inspection devices

51.2005Electric Power Company "Hintai", province HebeiExecution of experimental works on the equipment and delivery of inspection devices

52.2005Beijing Branch of Shanxi Railway, Locomotive DepotExecution of experimental works on the equipment and delivery of inspection devices

53.2006Petroleum Pipeline Construction Quality Supervision Center, LanfangExecution of experimental works on the equipment and delivery of inspection devices

54.2006Company of Instruments for Well Drilling, DaqingExecution of experimental works on the equipment and delivery of inspection devices

55.2006TPS "Ma Tou", Han DanExecution of experimental works on the equipment and delivery of inspection devices

56.2006Guangdong Power Grid Test and Research InstituteExecution of experimental works on the equipment and delivery of inspection devices

57.2006Taiyuan TPS-2Execution of experimental works on the equipment and delivery of inspection devices

58.2006Henshi TPS, province ShandongExecution of experimental works on the equipment and delivery of inspection devices

59.2006Petrochina Pipeline Company R&D CenterExecution of experimental works on the equipment and delivery of inspection devices

60.2006TPS "Han Feng", province HebeiExecution of experimental works on the equipment and delivery of inspection devices

61.2008-2009SEMBOO Company, BeijingExecution of experimental works on the equipment and delivery of inspection devices

62.2009Beijing Special Equipment Inspection CenterExecution of experimental works on the equipment and delivery of inspection devices

63.2009Lin Yi Special Equipment Inspection Center, province ShandongExecution of experimental works on the equipment and delivery of inspection devices

64.2009Nang Tong University, province Jiang SuExecution of experimental works on the equipment and delivery of inspection devices

65.2009Wei Hai Special Equipment Inspection Center, province ShandongExecution of experimental works on the equipment and delivery of inspection devices

66.2009Hang Zhou Marine University, province ZhejiangExecution of experimental works on the equipment and delivery of inspection devices

67.2009Petroleum Production Equipment Inspection CenterExecution of experimental works on the equipment and delivery of inspection devices

68.2008-2015SinopecExecution of experimental works on the oil and gas equipment (pipelines, vessels)more than 80 objects
69.2011-2015CNP CompanyExecution of experimental worksmore than 40 km
CROATIA
1.2015
2019
HRID - Non Destructive Testing LtdNon-contact magnetometric diagnostics of buried gas pipelines17.6 km20 years
COLOMBIA
1.2009Tecnicontrol S.AInspection of buried pipelines and vessels5 km
CZECH REPUBLIC
1.2011-2018PREDITEST Ltd.Non-contact inspection of buried gas pipelines100 km30 years
FINLAND
1.1995Plant "Vahasilta Oy"Diagnostics of new vessels

2.1995Firm "AGA"Diagnostics of pipelines and vessels
18 years
GERMANY
1.1994Firm "Babcock"Experimental job on diagnostics of boiler tubes

HUNGARY
1.2013Trans Lex Work KftInspection of the tubes

2.2013Trans Lex Work KftInspection of the turbine blades and carbon dryer

3.2013-2014Trans Lex Work KftInspection of the buried pipeline, rectifying column and boiler transfer pipe

INDIA
1.1992TPS "Karadi" (Nagpur)Life estimation study of HP rotor of TK-120 turbineTK-120 turbine104000
2.1992Bhatinda TPSLife estimation study of turbine unit 3 elements110 MW turbine87000
3.1994Gandhinagar TPSDiagnostics of elements of GT-1731 boiler #1380 t/hour boiler95000
4.1994Barauni TPSLife estimation study of rotor of K-50 turbine50 MW turbine150000
5.1995Ukai TPSLife estimation study of 120 MW boiler unit 2120 MW boiler100000
6.1996Ukai TPSLife estimation study of 120 MW turbine unit 2120 MW turbine100000
7.1996Harduaganj TPSDiagnostics of elements of K-50 turbine unit 150 MW turbine
8.1998OBRA TPSLife estimation study of 50 MW unit 250 MW unit124000
IRAQ
1.2000Nassiria TPSTechnical diagnostics of boiler, waterwall tubes and steam linesTGME-206 boiler100000
2.2001Nassiria TPSAnalysis of structure and mechanical properties of damaged pipes metalboiler #3
3.2001InterenergoserviceAnalysis of structure and mechanical properties of TGME-206 waterwall pipes and steam pipes sample at TPS power unit

4.2001InterenergoserviceMetallographic examination of metal of live steam and hot overheating steampipes at TPS power unit

5.2004Dora TPSMetal inspection at two unit boilers160 MW boiler
6.2004Nadjibia TPSMetal inspection on turbine #5 rotor

7.2004El-Mussaib TPSMetal inspection on boilers #1 and #4

JAPAN
1.2014FTS LtdFatigue tests of steel specimens

KAZAKHSTAN
1.1990Alma-Ata TPS-1, TPS-2Diagnostics of boiler tubes

2.1991Pavlodar TPSDiagnostics of steam lines

3.2014KazTransOilDiagnostics of buried water line "Astrakhan - Mangyshlak"⌀1020 mm - 460 km
4.2018Kazakhmys Ltd.Complex diagnostics of buried water line⌀1020 mm - 4 km30 years
KOREA
1.2001LGDevelopment of device and technique for quality control of welding between valve and piston with usage of MMM method

2.2014PAULTEK Ltd.Inspection of steam pipelines without insulation removal

LATVIA
1.1999Riga TPS-1Diagnostics of welds of deaerator, pipelines and steam drum

2.2005-2006Riga Shipyard, laboratory of metalsInspection of ship bodies. Inspection of drive shafts. Certification of welders using the MMM method

3.2005Riga TPS-2Inspection of heat surface tubes. Inspection of high-pressure steam pipelines

LITHUANIA
1.1999Kaunas TPSDiagnostics of steam lines and waterwall tubes

2.2001-2006Technical Supervision Center, VilniusInspection of power equipment (heat surface tubes, bends, steam pipelines), chemical equipment, industrial pipelines, etc.

MACEDONIA
1.1997Bitola TPSDiagnostics of water-fed pipelines and heating surface tubes

MALAYSIA
1.2012-2013ShellInspection of the Shell buried pipeline and pressure vessels

MOLDOVA
1.1991Moldavian TPSDiagnostics of turbine blades and steam pipelinesK-300 turbine
2.2014-2021MoldovaTransGazInspection of gas pipelines⌀159, 219, 273, 325, 377 - 200.78 km
MONGOLIA
1.1991Ulan-Bator TPS-3Diagnostics of waterwall tubes of boiler320 t/hour boiler
2.1991Ulan-Bator TPS-4Diagnostics of turbine rotorPT-60-130 turbine
OMAN
1.2015Oman gas companyNon-contact magnetometric diagnostics of buried gas pipelines5 km
POLAND
1.1990-1992TPS "Jeran" (Warsaw)Diagnostics of waterwall tubes of boilers #1,2,3,5,8OP-230 boiler, 230 t/h150000- 170000
2.1991TPS "Povislie" (Warsaw)Diagnostics of drums of two boilers ("Babcock")100 t/hour boiler60 yeas
3.1991Belhatov TPSDiagnostics of elements of 360 MW turbine of firm "ABB"360 MW turbine30000- 40000
4.1991Gdansk TPSDiagnostics of tubes of hot-water boiler

5.1991-1993Belostok TPSDiagnostics of elements of OP-55 turbine, unit 1-3OP-55 turbine50000
6.1992Ostroleika TPSDiagnostics of drums of "soda" boiler100 t/hour boiler70000
7.1992Ostroleika TPSDiagnostics of waterwall tubes100 t/hour boiler50000
8.1992Yavozino TPSDiagnostics of oil-line200 MW turbine70000- 80000
9.1992TPS "Sikerki" (Warsaw)Diagnostics of elements of K-125 turbine (firm "ABB")125 MW turbine50000
10.1994TPS "Kanin"Control of steam drums230 t/hour boiler
11.1994Gdynia TPSDiagnostics of tubes of hot-water boiler

12.1995Zaklady azotowe "Pulawy"Diagnostics of pipelines and compressors
20 years
13.1997OBMiR REDOR (Bielsko-Biala)Delivery of control devices and technique for indented pairs

14.1999Gdansk TPSDiagnostics of drum welds

15.1999-2004ANWIL S.A. (Wotslavsk)Diagnostics of polymerization reactor
more 10 years
16.1999Mining plant (Inovrotslav)Diagnostics of internal tubes of boiler (⌀32 mm)

17.1999PKN S.A. (Plotsk)Diagnostics of compressor rods

18.1999Belhatov TPSDiagnostics of waterwall tubes and blades

19.1999Zaklady azotowe "Pulawy"Diagnostics of tubes of heat exchangers

20.2000Botdanka mineDiagnostics of load-carrying metal structures and feed chains

21.2001Metal ScienceDiagnostics of pipelines Z.A.Kedzierzyn-Kozle

22.2002Laziska TPSExamination of boilers #9, 10

23.2002ANWIL S.A. (Wotslavsk)Examination of vessels

24.2003Pumping plant, WarsawInspection of pump shafts before and after heat treatment

25.2003Laziska TPSInspection of ash-lines with usage of scanning device

26.2003Katowice Institute of MinesInspection of ropes (⌀16mm) at breakdown test

27.2004TPS "Kogeneracja" WotslavskDiagnostics of boiler waterwall tubes

28.2004Oil concern "OPLEN" , PlotskIn-tube diagnostics of boiler27H2/E1 boiler
29.2004-2005Laziska TPSExamination of boilers

30.2005Laziska TPSExamination of turbine rotor (Alstom Power S.A.Elblag)13UK125 turbine
31.2006Antenna mast, GdyniaInspection of elements of antenna mast

32.2006Gdansk ShipyardInspection of equipment components at repair shipyard

33.2006OPEL GM, GliwiceInspection of welded joints of hinges with automotive body

34.2006"WIBREM" WroclawExamination of steam turbine elements after heat treatment

35.2006"Wagony Swidnica"Inspection of welded joints of tanks

36.2006Warsaw RailwayDiagnostics of rails at railway section "Warsaw-Central - Warsaw-Western"

37.2008-2009Gas System, WarsawDiagnostics of buried gas pipelines40 km
38.2009Yavozino TPSDiagnostics of turbine steam pipelines, studs200 MW turbine No.5
39.2009Gozzow TPSDiagnostics of boiler waterwall tubes, steam pipelines, water circulatorsT-101 boiler
40.2010-2011,
2013-2018
Gas System, WarsawNon-contact inspection of buried gas pipelines⌀320 ; ⌀420; ⌀530 mm - 190.2 km30 years
41.2020International Paper-Kwidzyn Sp. z o.o.Soot blower lances analysis

UKRAINE
1.1990Zaporojie TPSDiagnostics of steam superheater joints on boiler.TPP-312 boiler, 300 MW
2.1991Ladyjinsk TPSDiagnostics of turbine rotors.K-300 turbine
3.1991Krivoi Rog TPSDiagnostics of coils of water economizer on boilerP-50 boiler, 300 MW
UNITED KINGDOM
1.2013ShellInspection of the buried gas piping1.5 km
USA
1.1997WashingtonControl of individual beams and units of Woodrow Wilson bridge over Potomac river

2.1997State of GeorgiaMeasurement of magnetic field strength of welded joints on bridge over Allatuna lake

YUGOSLAVIA
1.1996TPS "Nikola Tesla"Diagnostics of waterwall tubes.

2.1996Subotitsa plant of mineral fertilizersDiagnostics of ammoniac vessel